{"id":2010,"date":"2024-11-05T15:24:11","date_gmt":"2024-11-05T15:24:11","guid":{"rendered":"https:\/\/ikoknowledgecenter.com\/docs\/uncategorized\/how-many-screws-are-used-to-fasten-an-iko-enertherm-pir-insulation-board-on-a-flat-roof\/"},"modified":"2025-06-23T13:30:30","modified_gmt":"2025-06-23T13:30:30","password":"","slug":"how-many-screws-are-used-to-fasten-an-iko-enertherm-pir-insulation-board-on-a-flat-roof","status":"publish","type":"docs","link":"https:\/\/ikoknowledgecenter.com\/en\/docs\/insulation\/how-many-screws-are-used-to-fasten-an-iko-enertherm-pir-insulation-board-on-a-flat-roof\/","title":{"rendered":"How many screws are used to fasten an IKO Enertherm PIR insulation board on a flat roof?"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Screws in PIR insulation boards serve a dual purpose:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Ensuring the proper long-term connection between insulation boards.<\/li>\n\n\n\n<li>Providing sufficient resistance against wind loads for the roof.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">To ensure proper connection, a minimum number of screws per plate is necessary:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>4 screws<\/strong> per plate for <strong>small size<\/strong> plates<\/li>\n\n\n\n<li><strong>6 screws<\/strong> per plate for <strong>large format<\/strong> plates.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">A number of additional screws may be necessary as a function of the occurring wind load and are determined, among other things, by the building location, building height and terrain roughness. To identify this, IKO can perform a wind load calculation.<\/p>\n\n<p class=\"wp-block-paragraph\">You can request a wind load calculation here: <a href=\"https:\/\/eu.iko.com\/en\/flat-roof-systems\/iko-services\/wind-load-calculation\/\" target=\"_blank\" rel=\"noopener\">Wind load calculation | IKO<\/a><\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Screws in PIR insulation boards serve a dual purpose: To ensure proper connection, a minimum number of screws per plate is necessary: A number of additional screws may be necessary as a function of the occurring wind load and are determined, among other things, by the building location, building height and terrain roughness. To identify [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"footnotes":"","_members_access_role":[],"_members_access_error":""},"doc_category":[331],"doc_tag":[920,65,333,927,338,334,888,341,846],"glossaries":[],"class_list":["post-2010","docs","type-docs","status-publish","hentry","doc_category-insulation","doc_tag-fixing-technology","doc_tag-flat-roof","doc_tag-iko-enertherm-en","doc_tag-insulation-fixing","doc_tag-mechanical-fastening","doc_tag-pir-en","doc_tag-stability","doc_tag-wind-load","doc_tag-wind-load-en"],"year_month":"2026-11","word_count":106,"total_views":"391","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Luna Degraeve","author_nicename":"luna","author_url":"https:\/\/ikoknowledgecenter.com\/en\/author\/luna\/"},"doc_category_info":[{"term_name":"Insulation","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-category\/insulation\/"}],"doc_tag_info":[{"term_name":"fixing technology","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/fixing-technology\/"},{"term_name":"Flat roof","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/flat-roof\/"},{"term_name":"IKO Enertherm","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/iko-enertherm-en\/"},{"term_name":"insulation fixing","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/insulation-fixing\/"},{"term_name":"mechanical fastening","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/mechanical-fastening\/"},{"term_name":"pir","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/pir-en\/"},{"term_name":"stability","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/stability\/"},{"term_name":"wind load","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/wind-load\/"},{"term_name":"wind load","term_url":"https:\/\/ikoknowledgecenter.com\/en\/docs-tag\/wind-load-en\/"}],"knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/docs\/2010","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/comments?post=2010"}],"version-history":[{"count":3,"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/docs\/2010\/revisions"}],"predecessor-version":[{"id":3305,"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/docs\/2010\/revisions\/3305"}],"wp:attachment":[{"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/media?parent=2010"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/doc_category?post=2010"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/doc_tag?post=2010"},{"taxonomy":"glossaries","embeddable":true,"href":"https:\/\/ikoknowledgecenter.com\/en\/wp-json\/wp\/v2\/glossaries?post=2010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}